1 |
OUGHALIME A, ISMAIL W R, LIONG C Y, et al. Vehicle and driver scheduling modelling: a case study in UKM[C]//2009 2nd Conference on Data Mining and Optimization,Kajand, Malaysia:IEEE, 2009: 53-59.
doi: 10.1109/dmo.2009.5341911
|
2 |
RODRIGUES MM, DE SOUZA C C, MOURA A V. Vehicle and crew scheduling for urban bus lines[J]. European Journal of Operational Research, 2006, 170(3): 844-862.
doi: 10.1016/j.ejor.2004.06.035
|
3 |
HUISMAN D, WAGELMANS A P M. A solution approach for dynamic vehicle and crewscheduling[J]. European Journal of Operational Research, 2006, 172(2): 453-471.
doi: 10.1016/j.ejor.2004.10.009
|
4 |
IBARRA-ROJAS O J, DELGADO F, GIESEN R, et al. Planning, operation, and control of bus transport systems: a literaturereview[J]. Transportation Research Part B: Methodological, 2015, 77: 38-75.
doi: 10.1016/j.trb.2015.03.002
|
5 |
PRILESZKY I, HORV-TH B. New ways in vehicle and crew scheduling[J]. Acta Technica Jaurinensis, 2011, 4(2): 297-304.
|
6 |
LAM E, VAN HENTENRYCK P, KILBY P. Joint vehicle and crew routing andscheduling[M]//Lecture Notes in Computer Science. Cham: Springer International Publishing, 2015: 654-670.
doi: 10.1007/978-3-319-23219-5_45
|
7 |
DOM-NGUEZ-MART-N B, RODR-GUEZ-MART-N I, SALAZAR-GONZ-LEZ JJ. An exact algorithm for a vehicle-and-driver scheduling problem[J]. Computers & Operations Research, 2017, 81: 247-256.
doi: 10.1016/j.cor.2016.12.022
|
8 |
DE ATHAYDE PRATA B. Amultiobjective metaheuristic approach for the integrated vehicle and crew scheduling[J]. Journal of Transport Literature, 2016, 10(2): 10-14.
doi: 10.1590/2238-1031.jtl.v10n2a2
|
9 |
HUISMAN D, FRELING R, WAGELMANS A P M. Multiple-depot integrated vehicle and crewscheduling[J]. Transportation Science, 2005, 39(4): 491-502.
doi: 10.1287/trsc.1040.0104
|
10 |
FRELING R, HUISMAN D, WAGELMANS A. Models and algorithms for integration of vehicle and crew scheduling[J]. Journal of Scheduling, 2003, 6(1): 63-85.
doi: 10.1023/A:1022287504028
|
11 |
MESQUITA M, PAIAS A, RESP-CIO A. Branching approaches for integrated vehicle and crewscheduling[J]. Public Transport, 2009, 1(1): 21-37.
doi: 10.1007/s12469-008-0005-2
|
12 |
MESQUITA M, PAIAS A. Set partitioning/covering-based approaches for the integrated vehicle and crew schedulingproblem[J]. Computers & Operations Research, 2008, 35(5): 1562-1575.
doi: 10.1016/j.cor.2006.09.001
|
13 |
DE GROOT S W, HUISMAN D. Vehicle and crew scheduling: solving large real-world instances with an integrated approach[M]//Lecture Notes in Economics and Mathematical Systems. Berlin, Heidelberg: Springer, 2008: 43-56.
doi: 10.1007/978-3-540-73312-6_3
|
14 |
HAASE K, DESAULNIERS G, DESROSIERS J. Simultaneous vehicle and crew scheduling in urban mass transitsystems[J]. Transportation Science, 2001, 35(3): 286-303.
doi: 10.1287/trsc.35.3.286.10153
|
15 |
陈明明, 牛惠民. 带时间窗的多车场公交乘务排班优化[J]. 兰州交通大学学报, 2015, 34(4): 100-106.
doi: 10.3969/j.issn.1001-4373.2015.04.019
|
16 |
陈明明, 牛惠民. 多车场公交乘务排班问题优化[J]. 交通运输系统工程与信息, 2013, 13(5): 159-166.
doi: 10.3969/j.issn.1009-6744.2013.05.024
|
17 |
张宇石, 陈旭梅, 于雷, 等. 基于换乘站点的轨道交通与常规公交运营协调模型研究[J]. 铁道学报, 2009, 31(3): 11-19.
doi: 10.3969/j.issn.1001-8360.2009.03.003
|
18 |
MESQUITA M, MOZ M, PAIAS A, et al. A new model for the integrated vehicle-crew-rostering problem and a computational study onrosters[J]. Journal of Scheduling, 2011, 14(4): 319-334.
doi: 10.1007/s10951-010-0195-8
|