[1]刘晓娟,张雁鹏,汤自安城市轨道交通智能控制系统[M]北京:中国铁道出版社,2008:20-55
[2]邢建平城市轨道交通ATS时刻表管理系统的研究与实现[D]兰州:兰州交通大学,2012
[3]CAIMI G, CHUDAK F, FUCHSBERGER M, et al A new resourceconstrained multicommodity flow model for conflictfree train routing and scheduling[J] Transportation Science, 2011,45(2): 212–227
[4]SCHMIDT M Delay management with rerouting of passengers[J] Transportation Science, 2012,46(1):74–89
[5] LOUWERSE I, HUISMAN D Adjusting a railway timetable in case of partial or complete blockades[J] European Journal of Operational Research,2014,235(3):583–593
[6] NIU H M, ZHOU X S, GAO R H Train scheduling for minimizing passenger waiting time with timedependent demand and skipstop patterns: Nonlinear integer programming models with linear constraints[J] Transportation Research Part B: Methodological, 2015,76:117-135
[7]肖鹏城市轨道交通列车自动调整模型算法研究[D]成都:西南交通大学,2006
[8]徐蒨基于预测控制的城市轨道交通列车运行调整研究[D]北京:北京交通大学,2010
[9]李玉宝,钟毅强地铁系统时刻表编辑器浅析[J]铁道通信信号,2012,48(1):81-83
[10]陈祥献,王东,黄海CBTC系统仿真测试平台设计[J]铁路计算机应用,2011,20(8):50-54
[11]徐东城市轨道交通列车运行自动调整研究方法综述[J]现代城市轨道交通,2015(1):69-73
[12]霍建维突发事件下的列车运行调整模型与算法[D]北京:北京交通大学,2014
[13]李宣城市轨道交通时刻表FALKO软件概述[J]才智,2012(7):325
[14]张雁鹏,党建武,邢建平城市轨道交通列车自动监督时刻表管理系统设计[J]城市轨道交通研究,2013(10):48-52
[15]任永刚列车时刻表编辑器的设计与实现[J]城市公共交通,2014(3):29-31
[16]王美宏城市轨道交通时刻表系统框架设计[J]铁路计算机应用,2014,23(2):49-51 |