山东科学 ›› 2023, Vol. 36 ›› Issue (5): 33-43.doi: 10.3976/j.issn.1002-4026.2023.05.005

• 能源与动力 • 上一篇    下一篇

人工湖下连采连充煤炭开采地表移动变形预测研究

张国建1,2a,3, 孟浩1,*(), 熊威4, 白涛5, 孟现臣5, 王军2b, 吕晓2b   

  1. 1.中国矿业大学 环境与测绘学院,江苏 徐州 221116
    2.山东建筑大学 a.测绘地理信息学院; b.土木工程学院, 山东 济南 250101
    3.山东能源集团技术研究总院,山东 济南 250101
    4.山东省路桥工程设计咨询有限公司, 山东 济南 250000
    5.内蒙古裕兴矿业有限公司,内蒙古 赤峰 016064
  • 收稿日期:2022-10-21 出版日期:2023-10-20 发布日期:2023-10-12
  • 通信作者: 孟浩 E-mail:2411656826@qq.com
  • 作者简介:张国建(1989—),男,博士,研究方向为变形监测与沉陷控制。
  • 基金资助:
    国家自然科学基金青年基金(52204097)

Predicting surface movement and deformation for continuous mining and continuous backfilling under an artificial lake

ZHANG Guojian1,2a,3, MENG Hao1,*(), XIONG Wei4, BAI Tao5, MENG Xianchen5, WANG Jun2b, LÜ Xiao2b   

  1. 1. School of Environment and Spatial Informatics, China University of Mining and Technology, Xuzhou 221116, China
    2. a.School of Surveying and Geo-Informatics; b. School of Civil Engineering, Shandong Jianzhu University, Jinan 250101, China
    3. Technology Research Institute of Shandong Energy Group, Jinan 250101, China
    4. Shandong Road and Bridge Engineering Design Consulting Institute, Jinan 250000, China
    5. Inner Mongolia Yuxing Mining Institute, Chifeng 016064, China
  • Received:2022-10-21 Online:2023-10-20 Published:2023-10-12
  • Contact: MENG Hao E-mail:2411656826@qq.com

摘要:

为研究人工湖下煤炭连采连充开采后的地表移动变形规律,对连采连充工作面进行了室内力学试验和现场取芯力学试验,验证充填体的可行性;基于等价采高概率积分法,对连采连充工作面进行地表沉陷预测;通过数值模拟计算,分析导水裂缝带发育高度,并与概率积分法结果进行对比。结果表明:充填体的强度5.063 MPa超过设计强度2.0 MPa,能够确保矿井的安全开采;连采连充工作面开采后,地表倾斜值极值0.3 mm/m,地表水平变形极值-0.2 mm/m,小于砖混结构建筑I级损坏范围,周围地表沉陷平缓,无安全隐患;导水裂缝带发育高度约49.7 m,距离隔水层约160.3 m,水下采煤安全,FLAC3D数值模拟和概率积分法结果比较接近,验证连采连充技术可有效减缓地表移动变形。

关键词: 连采连充, 充填体, 地表移动变形预测, 概率积分法, 数值模拟

Abstract:

To investigate surface movement and deformation characteristics due to continuous mining and continuous backfilling (CMCB)of coal under artificial lakes, laboratory and field coring mechanical tests were conducted on the CMCB area to verify the feasibility of the filling body. Based on the equivalent mining height probability integration method, the surface subsidence of the CMCB area was predicted. The height of the water-conducting fracture zone was analyzed using numerical simulation, and its results were compared with those of the probability integration method. The results show that the strength of the filling body is 5.063 MPa, which is higher than the designed strength of 2.0 MPa, ensuring safe mining.Owing to continuous mining and backfilling in the area, the maximum inclination value of the surface was 0.3 mm/m and the maximum horizontal deformation value of the surface was -0.2 mm/m, respectively, which is less than the range of grade Ⅰ damage to brick and concrete structures. The surrounding surface subsidence was gentle, and there was no safety hazard. The height of the water-conducting fracture zone was about 49.7 m, and the distance from the waterproof layer was about 160.3 m, indicating the safety of underwater coal mining. Results of the FLAC3D numerical simulation and probability integration method were close, thereby verifying that the CMCB technology can effectively slow down surface movement and deformation.

Key words: continuous mining and continuous backfilling, backfill, surface movement and deformation prediction, probability integration method, numerical simulation

中图分类号: 

  • TD823

开放获取 本文遵循知识共享-署名-非商业性4.0国际许可协议(CC BY-NC 4.0),允许第三方对本刊发表的论文自由共享(即在任何媒介以任何形式复制、发行原文)、演绎(即修改、转换或以原文为基础进行创作),必须给出适当的署名,提供指向本文许可协议的链接,同时表明是否对原文作了修改,不得将本文用于商业目的。CC BY-NC 4.0许可协议详情请访问 https://creativecommons.org/licenses/by-nc/4.0