山东科学 ›› 2025, Vol. 38 ›› Issue (4): 130-138.doi: 10.3976/j.issn.1002-4026.20240070

• 能源与动力 • 上一篇    

基于火电机组响应状态的“启动-并网”时长预测方法研究

张徐东1(), 段传俊1,*(), 吴中杰1, 李思1, 王成元2, 罗明2,*()   

  1. 1.山东中实易通集团有限公司,山东 济南 250000
    2.江苏大学 能源与动力工程学院,江苏 镇江 212013
  • 收稿日期:2024-05-20 出版日期:2025-08-20 发布日期:2025-08-05
  • 通信作者: 段传俊,罗明 E-mail:zxdtx2008@163.com;duancj1988@163.com;mingluo@ujs.edu.cn
  • 作者简介:张徐东(1993—),男,工程师,研究方向为电站锅炉节能与诊断研究。E-mail:zxdtx2008@163.com
  • 基金资助:
    国家自然科学基金项目(51606087)

“Startup-grid connection” duration prediction method based on the response state of thermal power units

ZHANG Xudong1(), DUAN Chuanjun1,*(), WU Zhongjie1, LI Si1, WANG Chengyuan2, LUO Ming2,*()   

  1. 1. Shandong Zhongshi Yitong Group Co., Ltd., Jinan 250000, China
    2. School of Energy and Power Engineering, Jiangsu University, Zhenjiang 212013, China
  • Received:2024-05-20 Online:2025-08-20 Published:2025-08-05
  • Contact: DUAN Chuanjun, LUO Ming E-mail:zxdtx2008@163.com;duancj1988@163.com;mingluo@ujs.edu.cn

摘要:

随着新能源装机规模的快速增加,火电机组在电网调峰方面的作用变得日益显著。快速、准确地预测火电机组“启动-并网”过程时长对调度人员及时调整电网运行状态至关重要。针对目前依赖人为经验预估“启动-并网”时长的问题,提出了一种火电机组“启动-并网”过程时长预测方法。对火电机组“启动-并网”过程进行全面分析,确定各阶段的关键运行参数;通过建立监测模型,判断机组响应状态;通过逻辑计算,实现对机组“启动-并网”过程时长的预测。在“网源平台”上对典型机组进行试点研究的结果表明,该模型能够精确的监测机组“启动-并网”响应状态,并成功预测机组“启动-并网”时长。这一方法为调度人员提供了及时的决策支持,有助于确保电网运行的安全性和稳定性。

关键词: 火电机组, 监测模型, 响应状态, 逻辑计算, 时长预测

Abstract:

With the rapid increase in the scale of new energy installations, the role of thermal power units in grid peak regulation has become crucial. Swift and precise prediction of the duration of the “startup-grid connection” process for thermal power units is essential for dispatchers to promptly adjust grid operation status. To address the current reliance on human experience for predicting the duration of the “startup-grid connection” process, this paper proposes a method for predicting the duration of this process for thermal power units. First, the startup-grid connection process of thermal power units is analyzed to identify key operational parameters at each stage. Then, logical calculations are leveraged to predict the duration of the “startup-grid connection” process. Results of a pilot test on a typical unit on the “Net-Source platform” indicate that the proposed model can accurately monitor the response state of the units during the “startup-grid connection” process and successfully predict its duration. This method provides timely decision support for dispatchers, helping to ensure the safety and stability of grid operations.

Key words: thermal power units, monitoring model, response state, logical calculation, duration prediction

中图分类号: 

  • TK114

开放获取 本文遵循知识共享-署名-非商业性4.0国际许可协议(CC BY-NC 4.0),允许第三方对本刊发表的论文自由共享(即在任何媒介以任何形式复制、发行原文)、演绎(即修改、转换或以原文为基础进行创作),必须给出适当的署名,提供指向本文许可协议的链接,同时表明是否对原文作了修改,不得将本文用于商业目的。CC BY-NC 4.0许可协议详情请访问 https://creativecommons.org/licenses/by-nc/4.0